File 34 - The Critical Path Method.

Title and statement of responsibility area

Title proper

The Critical Path Method.

General material designation

Parallel title

Other title information

Title statements of responsibility

Title notes

Level of description

File

Reference code

SCA190-GA165-3-34

Edition area

Edition statement

Edition statement of responsibility

Class of material specific details area

Statement of scale (cartographic)

Statement of projection (cartographic)

Statement of coordinates (cartographic)

Statement of scale (architectural)

Issuing jurisdiction and denomination (philatelic)

Dates of creation area

Date(s)

Physical description area

Physical description

Publisher's series area

Title proper of publisher's series

Parallel titles of publisher's series

Other title information of publisher's series

Statement of responsibility relating to publisher's series

Numbering within publisher's series

Note on publisher's series

Archival description area

Name of creator

Biographical history

Donald D. Cowan is a Distinguished Professor Emeritus (1999) and Adjunct Professor in the School of Computer Science, University of Waterloo, Waterloo, Ontario. He received a BASc in Engineering Physics from the University of Toronto in 1960 and an MSc and PhD from the University of Waterloo in Applied Mathematics in 1961 and 1965 respectively. He joined the Faculty of the University of Waterloo in 1961 and was the first chair of the Dept. of Applied Analysis and Computer Science, now the School of Computer Science (1967 to 1972) and also served as Associate Dean of Graduate Studies in the Faculty of Mathematics (1974 to 1978). Donald D. Cowan is Director of the Computer Systems Group, a computer science research group at the University of Waterloo in which he has been involved since the early 1960's.

Custodial history

Scope and content

A project outline with exercises titled, "the Critical Path Method." According to the document's introduction, "the purpose of the Critical Path Method (CPM) was to create a plan and then to place that plan on a schedule." It is likely this project outline was distributed to students as part of their coursework at the University of Waterloo.

Notes area

Physical condition

Immediate source of acquisition

Donated by Dr. Donald D. Cowan in 2004.

Arrangement

Language of material

  • English

Script of material

Location of originals

Availability of other formats

Restrictions on access

Terms governing use, reproduction, and publication

Finding aids

Associated materials

Related materials

Accruals

General note

For additional material related to the Critical Path Method in this fonds, please refer to the list of files linked in the related materials note.

Alternative identifier(s)

Standard number area

Standard number

Access points

Subject access points

Place access points

Name access points

Genre access points

Control area

Description record identifier

Institution identifier

Rules or conventions

Status

Level of detail

Dates of creation, revision and deletion

Described by CW and edited by JB 2005.
Revised by NM 2023.

Language of description

  • English

Script of description

Sources

Accession area

Related subjects

Related people and organizations

Related places

Related genres