File 781 - Grand River Conservation Authority : Baden Dam and Mill Pond : preliminary report on measures to upgrade Baden Dam and Mill Pond to operating condition : draft.

Title and statement of responsibility area

Title proper

Grand River Conservation Authority : Baden Dam and Mill Pond : preliminary report on measures to upgrade Baden Dam and Mill Pond to operating condition : draft.

Title notes

  • Source of title proper: Title from caption.

Level of description

File

Reference code

SCA205-GA183-29-781

Dates of creation area

Date(s)

Archival description area

Name of creator

(1966-)

Administrative history

The Grand River Conservation Authority is a corporate body governing the cooperative management of the Grand River watershed and its natural resources by municipalities, landowners and other organizations within the watershed. Formed in 1966 following ... »

Scope and content

Consists of ts.(photocopy) draft preliminary report on measures to upgrade the Baden Dam and Mill Pond to operating condition, prepared by G. Switzer, P.Eng., R. McMinn and J. Barlett for the Grand River Conservation Authority. Includes blackline ... »

Notes area

Physical condition

1 report in slide-lock cover with 3 loose blackline drawings inserted.

Availability of other formats

Report (not including 3 drawings) scanned as PDF 2023.

Related people and organizations